Contact Me |
Site Index:
|
|
Affirmative Fair Housing marketing Plan |
|
Management Agreement |
|
Property’s current budget |
|
Any current policy and procedure in place |
|
Resident selection criteria |
|
Waiting List and policy |
|
Applicant rejection letter |
|
Schedule of tenant damage charges |
|
Rent collection procedure and late charge schedule |
|
Property Rules |
|
Move In and Move Out sheets |
|
Pet policy (if applicable) |
|
Preventive Maintenance policy |
|
Resident request service logs |
A random audit of resident files will be conducted to verify HUD compliance regarding:
Eligibility and selection
Income and assets
Third party verification of resident income and assets
Household characteristics
Adherence to income limit guidelines
Lease and lease addendums
Drug Free Housing Policy
Resident deposit
Certification and recertification of family eligibility
Initial notice of next recertification
Citizenship documentation
9887/9887A Consent Form
Lead Based Paint Addendum
Social security number verification/documentation
Disposal of assets
HUD form 50059
The physical inspection will include a general inspection of buildings and grounds including, but not limited to:
Random selection of occupied and vacant resident units to determine the level of maintenance and security
Work and storage areas
Mechanical rooms
Laundry facilities
Trash storage
Particular attention will be paid to:
Areas cited for exigent health and safety items noted in the latest REAC inspection to ensure problems have been remedied.
Areas or units where Replacement Reserves have been released in the past 12 months.
A close-out meeting will be conducted upon the completion of the review to discuss the results and any preliminary findings and concerns identified.
Within 30 days of the review a written report which provides a rating, outline findings, cited and corrective actions needed. If the property is rated below satisfactory, a copy is sent to the Multifamily HUB or Program Center and mortgagee. An owner response is needed within 30 days from the date of the report outlining corrective action taken. Once it is determined that the owner has responded and taken all corrective action, the Compliance officer will notify the owner with a close-out letter.
I can offer you assistance by helping you to conduct preparatory review of your operation, resolve Review Findings, provide drafts of forms and documents to edit for your operation and other matters related to the Review.
Contact
me by phone 301-277-3465,
or by email at alvinl.sutherlin@verizon.net
and I can discuss the status of your project.
Date Updated: 09/27/2023 03:40:48 AM
Copyright
© 2021 - Designed by: Alvin L. Sutherlin
HUDConsultant All rights reserved